Technical Reference
Catalyst Grit: Technical Reference and Integrations
Review the technical, data, lifecycle, validation, and integration contract for Catalyst Grit.
Catalyst Grit · Technical Reference
Responsible voluntary goals, milestones, effort, context, support, rest, setbacks, strategy experiments, reflection, learning, progress, uncertainty, review, and export.
Purpose
This reference summarizes the functional contract, record expectations, lifecycle, validation, export, compatibility, integration, privacy, and release-review requirements for Catalyst Grit.
Prerequisites
- Current release notes and repository documentation
- A test environment
- A backup and rollback plan
- Access to product health or package checks
- The synthetic all-feature sample
Sample data
This article uses a fictional Resilient Community Retrofit Program. The files contain one demonstration row for every documented feature, so each capability can be tested without private or production data.
Download CSV feature examples · Download JSON workspace example
Preview
| # | Feature | Sample action | Expected result | Classification |
|---|---|---|---|---|
| 1 | Goal Workspace | create GRIT-LEARN-001 | a user-controlled goal workspace | synthetic-demo |
| 2 | Goal Definition | define an eight-week goal to complete a reproducible energy analysis | a bounded goal with completion criteria | synthetic-demo |
| 3 | Milestones | break the goal into data, calculation, analysis, and briefing steps | a milestone plan | synthetic-demo |
| 4 | Effort Log | record a 45-minute analysis session without moral judgment | an effort record | synthetic-demo |
| 5 | Context and Constraints | record limited evening availability, data access, and care obligations | a context record | synthetic-demo |
The downloadable files include all 16 feature rows.
Technical contract
Canonical identity
| Field | Value |
|---|---|
| Product slug | catalyst-grit |
| Product name | Catalyst Grit |
| Verified version | 1.5.0 |
| Content pack | 1.0.0 |
| Default article state | draft |
| Human review | required |
Functional surface
| Capability | Sample operation | Expected artifact |
|---|---|---|
| Goal Workspace | create GRIT-LEARN-001 | a user-controlled goal workspace |
| Goal Definition | define an eight-week goal to complete a reproducible energy analysis | a bounded goal with completion criteria |
| Milestones | break the goal into data, calculation, analysis, and briefing steps | a milestone plan |
| Effort Log | record a 45-minute analysis session without moral judgment | an effort record |
| Context and Constraints | record limited evening availability, data access, and care obligations | a context record |
| Support Map | add a mentor, documentation, and quiet-workspace support | a support plan |
| Recovery and Rest | schedule recovery and pacing | a sustainable effort plan |
| Setback Records | record a missed milestone caused by delayed data access | a contextual setback record |
| Strategy Experiments | compare 25-minute and 50-minute work sessions | a small learning experiment |
| Reflection | record what helped, harmed, changed, or remains uncertain | a qualitative learning entry |
| Learning Patterns | notice better progress with morning sessions | an advisory user-reviewable pattern |
| Progress Measures | track milestones, confidence, wellbeing, support, and learning | a multidimensional progress view |
| Uncertainty | mark low confidence when records are sparse | an uncertainty note |
| Review | let the user reject or revise an inaccurate suggestion | a human-controlled conclusion |
| Export | download only selected records | a consent-aware bundle |
| Decision and Research Handoffs | send a voluntary learning plan to Canvas | a scoped handoff receipt |
Core record fields
- Stable record or artifact ID
- Product and schema version
- Created and updated time
- Owner or responsible role
- Lifecycle or review state
- Source and provenance
- Units, period, geography, classification, or audience where applicable
- Validation findings and uncertainty
- Privacy and publication boundary
- Export or handoff integrity metadata
Lifecycle
Use a human-controlled lifecycle such as draft → review → approved/published, with revise, superseded, archived, withdrawn, failed, and recovered states where appropriate. Automated analysis may recommend; it must not silently approve, publish, or create private cases.
Validation
- Required-field and type checks
- Identifier and relationship checks
- Unit, period, geography, method, and classification compatibility
- Product and schema compatibility
- Source, evidence, and provenance completeness
- Permission, privacy, and publication-boundary checks
- Deterministic checksum or fingerprint validation for portable artifacts
Integrations
- Catalyst Canvas
- Decision Studio
- Research Lab
- Product Support Platform
- Platform Core
Send the minimum required fields through a typed contract. Preserve source product, destination, schema, artifact ID, review state, provenance, consent or privacy boundary, and receipt. Private Contact and Engagement records never belong in public support or research artifacts.
Release review
- Confirm interface, service, manifest, package, and schema versions.
- Validate the all-feature sample.
- Run product tests and integrity checks.
- Test one export and each supported handoff category.
- Document breaking changes and migration path.
- Update Last Verified Version before publishing this article.
Expected output
- A complete feature contract
- A validated synthetic export
- A compatibility decision
- A documented integration receipt
- A release-integrity report
Verification
- Product slug, version, schema, and IDs agree.
- Every documented feature maps to an actual interface, command, route, or record.
- The sample files produce the stated artifacts.
- Integrations preserve provenance and privacy.
- Migration, rollback, support, and release documentation are current.
Responsible use
Not for diagnosis, psychometrics, hiring, admissions, discipline, surveillance, ranking, or punitive evaluation.
