Worked Examples
Apply attribution and additionality — Global Impact Catalyst
Apply attribution and additionality in Global Impact Catalyst by separating observed outcomes, comparison-adjusted estimates, causal assumptions, business-as-usual conditions, and net impacts. This guide provides reproducible calculations, source-reviewed claim-governance requirements, sensitivity analysis, and verification procedures for developing defensible impact statements without overstating scientific evidence.
Application: Global Impact Catalyst
Component: Claim Governance / Program Measurement (related: Analysis, Review, Publication Controls)
Article type: How-to / procedure
Source-reviewed version: 2.0.0 (e75808a0aa272656b1fdbacd2491c30fd6b987dc)
Canonical contract: 1.1.0; Measurement module: 1.5.0; Analysis module: 1.7.0
Last verified installed feature version: Not established; staging acceptance pending
Evidence status: Source-reviewed methods; fully synthetic numerical illustration; independent scientific review pending
Estimated reading time: 22–27 minutes
Goal
Apply a transparent, auditable attribution-and-additionality workflow to an impact question without treating a change over time as an intervention effect or interpreting a plausible intervention effect as proof of additionality. The immediate deliverable is a draft, evidence-linked claim dossier specifying the observed outcome, estimand, counterfactual, competing explanations, eligibility decision, net accounting adjustments, uncertainty, review status and public-claim boundary.
Successful application means another analyst can reconstruct the result and distinguish observed change, conditional estimated effect, additionality assessment and approved claim. No result becomes a verified carbon credit, certified removal, policy causal finding or production-approved publication merely because GIC accepted the data.
Requirements
- Authority: legitimate research purpose, correct workspace and initiative, authorized source access, actor role, consent where applicable, privacy classification, license and retention rule.
- Estimand: outcome and units, affected population/activity, geographic and temporal boundaries, eligibility criteria, measurement protocol and method version.
- Evidence: versioned baseline and follow-up records, comparator or justified counterfactual, intervention date, source locators and hashes, relevant external factors, leakage/rebound and implementation effects.
- Governance: claim type, confidence rationale, independent scientific/technical reviewer, approval and publication workflow; avoid identifiable or confidential case content in public test fixtures.
- Installed environment: check the actual deployed Global Impact Catalyst version and permissions before executing interface instructions. This guide documents the source-reviewed Python contract, not a verified WordPress screen or remote API.
1. Distinguish four claims before calculating
| Claim level | What it says | Minimum evidence | What it cannot establish alone |
|---|---|---|---|
| Observed change | Outcome moved between specified periods | Comparable measurements and documented sources | Why it moved |
| Comparison-adjusted change | Observed change differs from a specified comparator | Aligned design, eligibility, confounder and sensitivity analysis | Causality without identifying assumptions |
| Contribution or causal effect | Intervention plausibly contributed to or caused change | Mechanism and external factors, or validated causal design and review | Project additionality and certified credit volume |
| Additional outcome | Activity goes beyond what would otherwise occur | Defensible business-as-usual/reference scenario and additionality assessment | Uniqueness of ownership, permanence, no double counting, or credit eligibility |
Terminology: GIC’s contribution_statement and causal_claim types are governed statements. They are not substitute certificates. Project-accounting protocols and crediting methodologies impose additional, context-specific requirements.
2. Review the GIC source-supported workflow
The reviewed canonical v1.1.0 contract defines five CLAIM_TYPES: descriptive_observation, progress_to_target_statement, comparison, contribution_statement and causal_claim. Its design_metadata stores design_type, comparison_basis, contribution_rationale and causal_design. The v1.5.0 measurement source exposes add_external_factor and add_contribution_note for documenting alternative explanations and evidence-linked contribution notes.
The source review did not verify an implemented algorithm that independently estimates additionality or automatically converts monitoring records into causal attribution. The reproducible estimator supplied with this article is an external illustrative diagnostic, not a hidden GIC feature.
3. Define the question and evaluation design
Example: “Did a synthetic production-site efficiency intervention plausibly change electricity intensity during 2025–2026 relative to an untreated comparison site, and what net saving remains after separately identified activity effects?” Define energy intensity as kWh per finished unit at fixed functional specifications. Restrict the illustration to 10,000 comparable units in 2026. Do not silently combine different production mixes, operating hours, sites or time windows.
A single baseline and follow-up per site allows arithmetic but cannot test the parallel-trends assumption or rule out selection bias, spillovers and time-varying confounders. Use additional pre-intervention periods, matched characteristics, intervention timing and falsification checks for a real quasi-experimental evaluation. The World Bank’s difference-in-differences guidance explains these identifying assumptions.
4. Specify baseline, counterfactual and source provenance
Freeze the observation table, group definitions, dates, unit conversion, functional unit, source rights, source-version record, and method revision before analyzing the effect. Define the comparator selection rationale, potential contamination or co-interventions, measured outcomes, missing-data treatment and baseline period. A counterfactual describes what is assumed to happen in the absence of the intervention; it is not directly observed and must not be portrayed as a measured fact.
For greenhouse-gas project accounting, choose a methodology appropriate to the project boundary. The GHG Protocol Project Protocol treats baseline scenarios and monitored project effects as distinct accounting requirements. Generic impact records alone do not supply that methodology.
5. Inspect the synthetic four-record observation set
The companion synthetic_attribution_energy_2025_2026.csv contains four invented data records. These are not field data from Sustainable Catalyst, Ireland, or any real facility. Values represent electricity intensity; the period dates and source identifiers are synthetic.
| Group | 2025 baseline | 2026 follow-up | Change |
|---|---|---|---|
| Intervention | 100 kWh/unit | 84 kWh/unit | −16 kWh/unit |
| Comparison | 95 kWh/unit | 90 kWh/unit | −5 kWh/unit |
The observed 16 kWh/unit improvement at the intervention site could be affected by common electricity-efficiency trends, plant composition, weather, output mix, equipment replacement and project selection. A control difference adjusts for a common trend only under additional assumptions.
6. Compute a conditional comparison-adjusted effect
The illustrative difference-in-differences model estimates the intervention minus comparator change, then reports a positive saving by reversing the sign of an intensity reduction. It is a candidate comparison-adjusted outcome, not a proven causal effect.
Δ intervention = 84 − 100 = −16 kWh/unit
Δ comparison = 90 − 95 = −5 kWh/unit
DiD = −16 − (−5) = −11 kWh/unit
Conditional reduction = 11 kWh/unit
Implied untreated intervention intensity = 100 − 5 = 95 kWh/unit
Candidate gross saving = 11 kWh/unit × 10,000 units ÷ 1000
= 110 MWh
The observed pre/post reduction alone would have been 160 MWh under the same output assumption. Reporting 160 MWh as an intervention-caused saving would ignore the comparator’s 50 MWh-equivalent background improvement. The 110 MWh figure remains contingent on the comparator and identifying assumptions.
7. Apply distinct net-accounting adjustments
For demonstration only, stipulate 18 MWh of rebound/shifted demand and 7 MWh of implementation energy use, neither already included in the observed intensity or comparator records. In a real project, prove these are within the accounting boundary, measured consistently and not double-counted.
Candidate comparison-adjusted gross = 110 MWh
Rebound / shifted consumption = 18 MWh
Implementation electricity = 7 MWh
Conditional net energy saving = 85 MWh
This is a conditional energy result. It is not equivalent to tCO₂e, a carbon removal, an offset or a verified additional outcome. Conversion to emissions would require an appropriate time- and location-dependent emissions-factor methodology, system boundaries and uncertainty treatment.
8. Assess additionality separately from effect estimation
Create a clearly recorded decision for the applicable methodology or policy purpose. Ask whether the intervention is already required by law or regulation; whether the baseline/standard practice would install the same equipment anyway; whether financial, technology or implementation barriers are substantiated; whether incentives are material; and whether the activity is common practice. The applicable standard—not a generic checkbox—defines how evidence is evaluated. The ICVCM methodology framework provides a high-integrity carbon-crediting reference but does not certify a particular Sustainable Catalyst project.
Worked-example outcome: status = not_assessed. The fixture lacks counterfactual adoption and regulatory-surplus evidence. The observed and comparison-adjusted values cannot be labeled additional or credit eligible. A positive calculated net effect is not an eligibility decision.
9. Document external factors and confounding
Use GIC’s source-reviewed add_external_factor to document, where supported by the installed release, material weather changes, price signals, output mix, parallel policy incentives, equipment life cycle and changes to the comparison group’s operations. Link each factor to a source version, period, influence direction, reviewer and limitations. Use add_contribution_note for theory-of-change evidence or competing explanations; neither method, by itself, identifies a causal effect.
Pre-specify and check for anticipation, contamination, shared trends, omitted variables, attrition, spillovers, rebound and interference. Do not recode unresolved confounders as zero or reclassify uncertain external effects as project benefits.
10. Test sensitivity to the counterfactual
Alter the assumed comparator improvement across plausible synthetic scenarios without changing the observed treated reduction. The companion tool calculates:
| Comparator improvement | Adjusted gross | Net after 25 MWh adjustments |
|---|---|---|
| 3 kWh/unit | 130 MWh | 105 MWh |
| 5 kWh/unit (fixture) | 110 MWh | 85 MWh |
| 8 kWh/unit | 80 MWh | 55 MWh |
All three results are conditional calculations. These are not statistical confidence limits, credible intervals or a comprehensive model uncertainty range. One preperiod cannot support a tested parallel-trends diagnosis. Record sensitivity of the conclusion to comparator selection, control contamination, method choice, measurement error, output denominator, net adjustments and policy baseline.
11. Construct an uncertainty and bias register
Separate random sampling error, instrument accuracy, denominator error and model-parameter uncertainty from structural uncertainty caused by counterfactual choice and unobserved confounding. Note whether inputs are correlated and whether samples cluster by site or time. Document bias directions even when numerical standard uncertainty cannot be estimated. For measured GHG changes, follow appropriate uncertainty guidance rather than fabricating a percentage or treating an arbitrary scenario range as a confidence interval.
In GIC’s reviewed Analysis v1.7.0, uncertainty models can annotate scenario points, but that machinery does not validate the proposed intervention counterfactual or automatically establish additionality. Use a separately reviewed causal or project-accounting model when needed.
12. Select the least ambitious defensible GIC claim
Use the claim-governance types as a ceiling, not a target. A descriptive_observation may state measured changes without attribution. A comparison requires an eligible design and explicit comparison basis (GIC-CLAIM-COMP-001/002). A contribution_statement needs a substantive mechanism and rationale (GIC-CLAIM-CONTRIB-001); monitoring-only evidence raises warning GIC-CLAIM-CONTRIB-002. A causal_claim additionally requires quasi-experimental or randomized metadata, a causal-design description, high declared confidence and reviewed/published status (GIC-CLAIM-CAUSAL-001 through 004). These checks establish structural eligibility, not scientific causal proof.
For this four-record fixture, use descriptive and explicitly qualified comparison language only. Do not set causal_claim or announce an additionality pass. Even a code-generated eligibility.eligible=true must not be interpreted as an assurance opinion.
13. Build the minimum traceable evidence packet
| Evidence item | Required record | Stop condition |
|---|---|---|
| Observation | Raw inputs, definition, denominator, time, source ID/version and hash | Missing/mixed units or unexplained changes |
| Counterfactual | Group selection, matching, pretrend evidence, alternatives | Unjustified common-trend assumption |
| Net adjustments | Rebound, leakage, implementation, boundary and non-overlap proof | Double counting or unstated exclusions |
| Additionality | Regulatory, common-practice and business-as-usual assessment | Assumed eligible merely because impact estimate >0 |
| Claim | Exact draft wording, design metadata, counterevidence and confidence basis | Stronger claim than design warrants |
| Governance | Reviewers, permissions, approval, publication hash, retention | Unapproved/restricted evidence made public |
14. Record work in approved repositories
Store the underlying observations in the correct governed initiative and workspace with explicit rights and identities. Preserve counterfactual design notes, source revisions, observation IDs, comparator, methods, alternative explanations and review history. GIC measurement data methods and claim contracts may record portions of this dossier; the accompanying CSV and JSON manifest implement the independent diagnostic only.
Prefer a saved method version and immutable evidence snapshot over pasting calculations into an unversioned note. Do not invent endpoints, buttons or WordPress fields. Confirm the actual installed GIC environment, its records, and permission policy before automation or API integration.
15. Review, approve and publish only with separate gates
Submit the exact draft statement, its evidence packet, method version, calculation output, uncertainty and limitations to an independent reviewer where feasible. In the reviewed publication controls, publication requires approval for the same subject, a quality assessment meeting the threshold, no open corrections and a draft hash matching the current snapshot. Editing after review requires a fresh draft/approval process.
These internal controls are not external carbon-standard certification or scientific validation. Restrict publication/search/export of private evidence and retain withdrawal history. Additionality and causal claims must be reviewed under the applicable external standards and study design before stronger public language is used.
Procedure
- Scope: record outcome, population, site/time boundary, functional unit, data rights and intended statement.
- Acquire: collect source-controlled baseline, follow-up, comparison, intervention and external-factor evidence; preserve IDs, rights, vintage and hashes.
- Classify: distinguish observations, adjusted comparisons, contribution/causal hypotheses and separately assessed additionality.
- Estimate: calculate before/after change, comparator change and conditional comparison-adjusted change, documenting the required identifying assumptions.
- Net: account for non-overlapping rebound, upstream inputs, leakage or other project effects appropriate to the unit and project boundary.
- Challenge: run alternative counterfactual, confounding, denominator and uncertainty scenarios. Do not claim statistical confidence from hand-chosen scenarios.
- Record: store raw and derived values, method and snapshot hashes, caveats, claim type, actor and revision.
- Review: obtain independent methodological and project-specific additionality review before public causal or crediting claims.
- Verify: perform the local fixture tests and separate staging acceptance; publication remains a different authorized action.
Troubleshooting
| Symptom | Likely cause | Resolution and safe acceptance |
|---|---|---|
| Before/after saving reported as attributable | No counterfactual | Reclassify as observed change; add defensible comparator and design |
| Comparator reverses apparent impact | Trend or group-selection sensitivity | Document alternative design; withhold directional claim pending analysis |
| Positive impact labeled additional | Regulatory or business-as-usual tests skipped | Mark additionality not assessed; obtain external-method evidence |
| Same effect counted in multiple projects | Overlapping portfolios or activity boundaries | Reconcile claim ownership, registry, time, leakage and double-counting rules |
| Unexpected net total | Sign, unit, denominator or duplicate adjustment | Recompute from raw values; compare to companion diagnostic and original sources |
| Causal claim blocked | Missing design, rationale, confidence or review | Inspect GIC-CLAIM-CAUSAL-001–004; downgrade if scientific evidence is inadequate |
| Reviewed claim changes after approval | Snapshot revision/hash mismatch | Preserve audit evidence; generate new draft and restart approval |
| Restricted source leaked | Tenant/permission/redaction failure | Contain release, preserve nonsecret audit trail and escalate through incident process |
Never repair a method or versioning defect by deleting the original evidence or quietly rewriting the baseline. Preserve a reproducible before/after record and the reviewer decision.
Verification
- Numerical reproduction: four synthetic records reproduce observed intervention improvement 16, comparison improvement 5, conditional adjusted improvement 11 kWh/unit, gross 110 MWh and conditional net 85 MWh.
- Snapshot integrity: the CSV digest equals the frozen JSON manifest, source identifiers are unique, units and periods align and values are finite.
- Sensitivity: comparator improvements of 3, 5 and 8 kWh/unit generate net 105, 85 and 55 MWh respectively; all outputs remain conditional.
- Scientific method: independent review checks comparability, pretrends, selection, time-varying confounders, leakage, rights, biases and the counterfactual; mark NOT VERIFIED when evidence is absent.
- Additionality: record a methodology-specific business-as-usual/regulatory assessment separately; the synthetic fixture is
not_assessedand may not be credited. - Source-reviewed GIC parity: test the installed product against real claim-governance validation rules and contribution/external-factor records; current offline arithmetic is not that test.
- Security and publication: independently test tenant isolation, forbidden exports, audit retention, approval hash, corrections and withdrawal in permitted staging accounts.
Local acceptance ≠ deployment verification ≠ scientific validation ≠ additionality certification. The companion test runner exercises only the packaged synthetic data and its independent arithmetic, not the deployed GIC runtime.
16. Review matrix and failure conditions
Use the companion staging_acceptance_matrix.csv. Record an observed outcome, responsible tester, timestamp, build/version, evidence path and reviewer decision for every case. Mandatory failures include unauthorized tenant reads, missing consent or rights, draft-to-published bypass, untraceable source revision, unreviewed causal wording, duplicate accounting, changed source hashes, invalid denominators, unexplained comparator selection, and net impact lacking appropriate boundary accounting.
For real project assessment, a robust observational design with no credible identifying strategy remains insufficient for causal wording, even if software tests pass. Likewise, credible causal estimation does not by itself demonstrate additionality for a carbon-crediting framework.
17. Scope and scientific limitations
- This four-record matched-comparison example is fully synthetic; it has only one preperiod and cannot test parallel trends.
- Energy intensity is not a direct GHG result; no emission-factor or carbon-crediting method is supplied.
- Other project, market and policy drivers may influence an estimated effect; negative or positive comparison-adjusted values are not evidence of a scientifically identified causal effect.
- Additionality varies by applicable scheme and is not guaranteed by a positive change, a project narrative, or GIC contract eligibility.
- GIC source-reviewed v2.0.0 includes claim validation and contribution/external-factor data objects, not an independently validated causal inference or carbon-additionality engine in the examined source.
- Publication and privacy controls require deployment-specific acceptance; synthetic tests cannot demonstrate protection of live personal or organizational data.
18. References and source review
- GHG Protocol — The GHG Protocol for Project Accounting. Baseline, monitoring and project GHG accounting.
- World Bank DIME Wiki — Difference-in-Differences. Comparison design and parallel-trends identification assumptions.
- World Bank — What to do about parallel trends with only baseline data?. Important one-preperiod limitations.
- ICVCM — How methodologies are assessed. Scheme-specific additionality and integrity criteria; not project certification.
- GIC — Claim Governance. Descriptive, contribution and causal boundaries.
- GIC — Validation Rules v1.1.0. Exact source-reviewed issue IDs.
- GIC — Canonical input/claim implementation. Claim types, design metadata and eligibility.
- GIC — Measurement repository. External factor and contribution note records.
- GIC — Publication and Withdrawal Controls. Approval, review, subject hash and corrections.
- GIC — v2.0.0 source release note. Code-review version, not verified installed product.
Editorial boundary: Article produced for Knowledge Base review on November 26, 2026. Product deployment, actual study data, independent causal analysis and carbon-additionality certification are not established. Source-linked references are version-specific.
